{"id":1584,"date":"2026-10-15T17:15:56","date_gmt":"2026-10-15T22:15:56","guid":{"rendered":"https:\/\/constructhubs.com\/?p=1584"},"modified":"2026-11-01T22:34:21","modified_gmt":"2026-11-02T03:34:21","slug":"panama-san-miguelito-cable-car-notice-to-proceed","status":"publish","type":"post","link":"https:\/\/constructhubs.com\/en\/panama-san-miguelito-cable-car-notice-to-proceed\/","title":{"rendered":"Notice to Proceed Issued for the Panama\u2013San Miguelito Cable Car: What the B\/.255 Million Project Will Look Like"},"content":{"rendered":"<p><strong>Today, Thursday, October 15, 2026, the Government of Panama issued the notice to proceed to Doppelmayr Panam\u00e1 Corp., a subsidiary of the Austrian company Doppelmayr, a world leader in cable transportation systems, to build the Panama\u2013San Miguelito cable car.<\/strong> The project is a 6.6-kilometer, six-station cable transit system connected to the <a title=\"Panama Metro (in Spanish)\" href=\"https:\/\/elmetrodepanama.com\/presidente-mulino-cumple-con-la-capital-y-san-miguelito-al-entregar-orden-de-proceder-para-el-proyecto-de-teleferico\/\" target=\"_blank\" rel=\"nofollow noopener\">Panama Metro<\/a>. The contract, countersigned by the Office of the Comptroller General, is worth B\/.255,163,788.03. Construction is scheduled to take 30 months, and the system could begin operating in the second half of 2028.<\/p>\n<p>The ceremony was held at the Metro&#8217;s Cincuentenario station, led by President Jos\u00e9 Ra\u00fal Mulino and Panama Metro General Director C\u00e9sar A. Pinz\u00f3n. After the event, ConstructHUBS spoke with Pinz\u00f3n and with the mayor of San Miguelito, Irma Hern\u00e1ndez, about what lies ahead for the district.<\/p>\n<h2 id=\"key-facts\">The cable car: key facts<\/h2>\n<ul>\n<li><strong>Contractor:<\/strong> Doppelmayr Panam\u00e1 Corp.<\/li>\n<li><strong>Contract amount:<\/strong> B\/.255,163,788.03<\/li>\n<li><strong>Length:<\/strong> approximately 6.6 km (4.1 miles)<\/li>\n<li><strong>Stations:<\/strong> 6 (Balboa, Cincuentenario, Samaria, Mano de Piedra, Valle de Urrac\u00e1, and Torrijos Carter)<\/li>\n<li><strong>Cabins:<\/strong> 10 seated passengers each; 210 cabins at launch, expandable to 270<\/li>\n<li><strong>Capacity:<\/strong> up to 2,800 people per hour per direction; about 26,000 passengers a day<\/li>\n<li><strong>Travel time:<\/strong> about 26 minutes end to end<\/li>\n<li><strong>Construction period:<\/strong> 30 months to substantial completion<\/li>\n<li><strong>Estimated start of operations:<\/strong> second half of 2028<\/li>\n<li><strong>Beneficiaries:<\/strong> more than 300,000 residents of the Panama and San Miguelito districts<\/li>\n<li><strong>Metro connection:<\/strong> transfer at Cincuentenario station<\/li>\n<\/ul>\n<h2 id=\"what-the-notice-to-proceed-means\">What the notice to proceed means<\/h2>\n<p>With the notice to proceed, the project formally enters its execution phase. In the first months, the initial work fronts will be planned and organized, and the land for the stations and other infrastructure will be acquired.<\/p>\n<p>Civil works will follow and, later, the installation of electromechanical equipment. According to the schedule, towers and stations will be built simultaneously along the route. The 30-month contract covers construction, installation, integration, and testing before the system enters service.<\/p>\n<p>&#8220;During my administration I have issued many notices to proceed, and this is one of the most satisfying,&#8221; President Mulino said during the ceremony.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone size-full wp-image-1248\" src=\"https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Presidente-Mulino-durante-el-acto-orden-de-proceder-del-teleferico-Panama-San-Miguelito.jpg\" alt=\"President Mulino at the notice-to-proceed ceremony for the Panama\u2013San Miguelito cable car\" width=\"1200\" height=\"675\" srcset=\"https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Presidente-Mulino-durante-el-acto-orden-de-proceder-del-teleferico-Panama-San-Miguelito.jpg 1200w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Presidente-Mulino-durante-el-acto-orden-de-proceder-del-teleferico-Panama-San-Miguelito-300x169.jpg 300w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Presidente-Mulino-durante-el-acto-orden-de-proceder-del-teleferico-Panama-San-Miguelito-1024x576.jpg 1024w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Presidente-Mulino-durante-el-acto-orden-de-proceder-del-teleferico-Panama-San-Miguelito-768x432.jpg 768w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Presidente-Mulino-durante-el-acto-orden-de-proceder-del-teleferico-Panama-San-Miguelito-590x332.jpg 590w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Presidente-Mulino-durante-el-acto-orden-de-proceder-del-teleferico-Panama-San-Miguelito-1191x670.jpg 1191w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Presidente-Mulino-durante-el-acto-orden-de-proceder-del-teleferico-Panama-San-Miguelito-577x325.jpg 577w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Presidente-Mulino-durante-el-acto-orden-de-proceder-del-teleferico-Panama-San-Miguelito-600x338.jpg 600w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<h2 id=\"route-and-stations\">Route and stations<\/h2>\n<p>The system links six stations at key points in the municipality: <strong>Balboa, Cincuentenario, Samaria, Mano de Piedra, Valle de Urrac\u00e1, and Torrijos Carter<\/strong>. Cincuentenario station will be the transfer point to the Panama Metro.<\/p>\n<p>San Miguelito is a district of hills and narrow streets, and a cable system overcomes those obstacles without competing with traffic. The government presents it as local transit adapted to the district&#8217;s terrain and complementary to the Metro and the Metrob\u00fas bus system.<\/p>\n<h2 id=\"capacity\">Capacity: how many passengers it will carry<\/h2>\n<p>Each cabin will carry 10 seated passengers. According to the official announcement, the system will be able to carry up to 2,800 people per hour per direction, or about 26,000 passengers a day.<\/p>\n<p>In an interview with ConstructHUBS, Pinz\u00f3n explained that the initial design is based on 1,800 passengers per hour per direction. The goal is to nearly double that figure within a few years. The system will start with 210 cabins and is designed to operate up to 270 if demand grows, without major structural changes.<\/p>\n<p>Pinz\u00f3n recalled the case of Metro Line 1. It opened with 3-car trains, became overcrowded within a few months, and forced an accelerated purchase of 5-car trains.<\/p>\n<p><img decoding=\"async\" class=\"alignnone size-full wp-image-1249\" src=\"https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/En-entrevista-con-ConstructHUBS-Pinzon-preciso-que-el-diseno-inicial-parte-de-1800-pasajeros-por-hora-y-sentido.jpg\" alt=\"In an interview with ConstructHUBS, Pinz\u00f3n explained that the initial design is based on 1,800 passengers per hour per direction\" width=\"1200\" height=\"675\" srcset=\"https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/En-entrevista-con-ConstructHUBS-Pinzon-preciso-que-el-diseno-inicial-parte-de-1800-pasajeros-por-hora-y-sentido.jpg 1200w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/En-entrevista-con-ConstructHUBS-Pinzon-preciso-que-el-diseno-inicial-parte-de-1800-pasajeros-por-hora-y-sentido-300x169.jpg 300w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/En-entrevista-con-ConstructHUBS-Pinzon-preciso-que-el-diseno-inicial-parte-de-1800-pasajeros-por-hora-y-sentido-1024x576.jpg 1024w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/En-entrevista-con-ConstructHUBS-Pinzon-preciso-que-el-diseno-inicial-parte-de-1800-pasajeros-por-hora-y-sentido-768x432.jpg 768w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/En-entrevista-con-ConstructHUBS-Pinzon-preciso-que-el-diseno-inicial-parte-de-1800-pasajeros-por-hora-y-sentido-590x332.jpg 590w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/En-entrevista-con-ConstructHUBS-Pinzon-preciso-que-el-diseno-inicial-parte-de-1800-pasajeros-por-hora-y-sentido-1191x670.jpg 1191w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/En-entrevista-con-ConstructHUBS-Pinzon-preciso-que-el-diseno-inicial-parte-de-1800-pasajeros-por-hora-y-sentido-577x325.jpg 577w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/En-entrevista-con-ConstructHUBS-Pinzon-preciso-que-el-diseno-inicial-parte-de-1800-pasajeros-por-hora-y-sentido-600x338.jpg 600w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<h2 id=\"travel-time-and-metro-connection\">Travel time and Metro connection<\/h2>\n<p>According to the government, the cable car will cut users&#8217; travel time between their homes and any point in the city by up to 50%. The full ride will take about 26 minutes.<\/p>\n<p>On fares, Pinz\u00f3n confirmed that <strong>there will be an integrated fare with the Metro<\/strong>, but it will take effect when Line 3 opens. The Metro has already begun fare studies, which will then be submitted to the president for approval.<\/p>\n<h2 id=\"san-miguelito\">San Miguelito: what happens above and what must happen below<\/h2>\n<p>Mayor Irma Hern\u00e1ndez sees the cable car as a transportation project and, at the same time, as an opportunity to rethink the district&#8217;s urban development. Her priorities are jobs during construction and the opportunities it can bring to her communities.<\/p>\n<p>Hern\u00e1ndez emphasizes what happens &#8220;below&#8221; the cable. For the system to work, people need to be able to walk to the stations. That is why she is calling for sidewalks, lighting, parking, and greater security, and she considers support from the central government essential to achieve them.<\/p>\n<p>She also proposes that the stations be more than just stops. In other countries, she explained, they house pharmacies, shops, child guidance centers, and cultural spaces.<\/p>\n<p>The municipality is committed to serving as a bridge between the project and the community, taking into account informal vendors, nearby homes, and schools. According to the mayor, the most affected communities will be Valle de Urrac\u00e1, Torrijos Carter, Samaria, and Cerro Batea.<\/p>\n<p><img decoding=\"async\" class=\"alignnone size-full wp-image-1250\" src=\"https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/La-alcaldesa-Irma-Hernandez-ve-el-teleferico-como-una-obra-de-transporte-y-a-la-vez-como-una-oportunidad-para-replantear-el-desarrollo-urbano-del-distrito.jpeg\" alt=\"Mayor Irma Hern\u00e1ndez sees the cable car as both a transportation project and an opportunity to rethink the district's urban development\" width=\"1536\" height=\"1024\" srcset=\"https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/La-alcaldesa-Irma-Hernandez-ve-el-teleferico-como-una-obra-de-transporte-y-a-la-vez-como-una-oportunidad-para-replantear-el-desarrollo-urbano-del-distrito.jpeg 1536w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/La-alcaldesa-Irma-Hernandez-ve-el-teleferico-como-una-obra-de-transporte-y-a-la-vez-como-una-oportunidad-para-replantear-el-desarrollo-urbano-del-distrito-300x200.jpeg 300w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/La-alcaldesa-Irma-Hernandez-ve-el-teleferico-como-una-obra-de-transporte-y-a-la-vez-como-una-oportunidad-para-replantear-el-desarrollo-urbano-del-distrito-1024x683.jpeg 1024w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/La-alcaldesa-Irma-Hernandez-ve-el-teleferico-como-una-obra-de-transporte-y-a-la-vez-como-una-oportunidad-para-replantear-el-desarrollo-urbano-del-distrito-768x512.jpeg 768w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/La-alcaldesa-Irma-Hernandez-ve-el-teleferico-como-una-obra-de-transporte-y-a-la-vez-como-una-oportunidad-para-replantear-el-desarrollo-urbano-del-distrito-590x393.jpeg 590w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/La-alcaldesa-Irma-Hernandez-ve-el-teleferico-como-una-obra-de-transporte-y-a-la-vez-como-una-oportunidad-para-replantear-el-desarrollo-urbano-del-distrito-1005x670.jpeg 1005w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/La-alcaldesa-Irma-Hernandez-ve-el-teleferico-como-una-obra-de-transporte-y-a-la-vez-como-una-oportunidad-para-replantear-el-desarrollo-urbano-del-distrito-577x385.jpeg 577w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/La-alcaldesa-Irma-Hernandez-ve-el-teleferico-como-una-obra-de-transporte-y-a-la-vez-como-una-oportunidad-para-replantear-el-desarrollo-urbano-del-distrito-1200x800.jpeg 1200w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/La-alcaldesa-Irma-Hernandez-ve-el-teleferico-como-una-obra-de-transporte-y-a-la-vez-como-una-oportunidad-para-replantear-el-desarrollo-urbano-del-distrito-600x400.jpeg 600w\" sizes=\"(max-width: 1536px) 100vw, 1536px\" \/><\/p>\n<h2 id=\"land-values\">Will land values rise?<\/h2>\n<p>Asked about the risk of displacement due to rising property values, Pinz\u00f3n said that a transit system increases the value of the properties along its route. He added that the cable car&#8217;s physical footprint is minimal, about 10 m\u00b2 (108 sq ft) per tower. The Metro will try to place the towers on state-owned land to avoid affecting residents.<\/p>\n<h2 id=\"safety\">Safety in wind and storms<\/h2>\n<p>Panama has heavy rain, thunderstorms, and wind gusts. Pinz\u00f3n explained that these conditions will be reported to the control center, which will decide in each case to ensure a safe trip. System performance will be measured using the international indicators already used by the Metro&#8217;s Operations and Maintenance Department.<\/p>\n<h2 id=\"other-communities\">Will the cable car reach other communities?<\/h2>\n<p>Yes, according to Pinz\u00f3n. The project solves a specific mobility problem and could open up a new mode of transportation in the country. Three <strong>&#8220;branches&#8221;<\/strong>, or extensions of the main line, are already being considered: toward the Corredor de los Pobres, Villa Za\u00edta, and Los Andes.<\/p>\n<h2 id=\"faq\">Frequently asked questions about the Panama\u2013San Miguelito cable car<\/h2>\n<h3>When will the San Miguelito cable car be ready?<\/h3>\n<p>If the schedule holds without setbacks, in the second half of 2028. The contract sets 30 months to substantial completion.<\/p>\n<h3>How much does the Panama\u2013San Miguelito cable car cost?<\/h3>\n<p>The contract, countersigned by the Comptroller General&#8217;s Office, is worth B\/.255,163,788.03.<\/p>\n<h3>Who is building the cable car?<\/h3>\n<p>Doppelmayr Panam\u00e1 Corp., under the supervision of the Panama Metro.<\/p>\n<h3>What are the cable car stations?<\/h3>\n<p>Balboa, Cincuentenario, Samaria, Mano de Piedra, Valle de Urrac\u00e1, and Torrijos Carter.<\/p>\n<h3>How many passengers will it carry?<\/h3>\n<p>Up to 2,800 people per hour per direction, about 26,000 a day. Operations start with 210 cabins of 10 passengers each and can grow to 270.<\/p>\n<h3>How long is the full ride?<\/h3>\n<p>About 26 minutes end to end.<\/p>\n<h3>Will the cable car have an integrated fare with the Metro?<\/h3>\n<p>Yes, starting when Metro Line 3 opens. Fare studies have already begun.<\/p>\n<h3>Where does it connect with the Panama Metro?<\/h3>\n<p>At Cincuentenario station, where passengers will transfer.<\/p>\n<h3>What happens during storms or high winds?<\/h3>\n<p>The control center assesses conditions and decides how to operate to keep passengers safe.<\/p>\n<h2 id=\"whats-next\">What&#8217;s next<\/h2>\n<p>In the coming months, work fronts will be prepared and land acquisition will begin. At <a title=\"ConstructHUBS News\" href=\"https:\/\/constructhubs.com\/en\/category\/news\/\">ConstructHUBS<\/a>, we will follow the progress of the Panama\u2013San Miguelito cable car and its impact on the construction industry, from local labor to the complementary works the district is asking for.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1251\" src=\"https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Estacion-Cincuentenario-de-teleferico-San-Miguelito-1024x576-1.jpg\" alt=\"Rendering of the Cincuentenario station of the Panama\u2013San Miguelito cable car\" width=\"1024\" height=\"576\" srcset=\"https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Estacion-Cincuentenario-de-teleferico-San-Miguelito-1024x576-1.jpg 1024w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Estacion-Cincuentenario-de-teleferico-San-Miguelito-1024x576-1-300x169.jpg 300w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Estacion-Cincuentenario-de-teleferico-San-Miguelito-1024x576-1-768x432.jpg 768w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Estacion-Cincuentenario-de-teleferico-San-Miguelito-1024x576-1-590x332.jpg 590w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Estacion-Cincuentenario-de-teleferico-San-Miguelito-1024x576-1-577x325.jpg 577w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Estacion-Cincuentenario-de-teleferico-San-Miguelito-1024x576-1-600x338.jpg 600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<div id='gallery-1' class='gallery galleryid-1584 gallery-columns-3 gallery-size-medium'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href=\"https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-6.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-6-300x200.jpg\" class=\"attachment-medium size-medium\" alt=\"Entregan la orden de proceder del telef\u00e9rico Panam\u00e1 - San Miguelito\" srcset=\"https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-6-300x200.jpg 300w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-6-1024x682.jpg 1024w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-6-768x512.jpg 768w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-6-1536x1024.jpg 1536w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-6-590x393.jpg 590w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-6-1005x670.jpg 1005w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-6-577x385.jpg 577w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-6-1200x800.jpg 1200w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-6-600x400.jpg 600w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-6.jpg 2000w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href=\"https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-7.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-7-300x200.jpg\" class=\"attachment-medium size-medium\" alt=\"Entregan la orden de proceder del telef\u00e9rico Panam\u00e1 - San Miguelito\" srcset=\"https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-7-300x200.jpg 300w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-7-1024x682.jpg 1024w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-7-768x512.jpg 768w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-7-1536x1024.jpg 1536w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-7-590x393.jpg 590w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-7-1005x670.jpg 1005w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-7-577x385.jpg 577w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-7-1200x800.jpg 1200w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-7-600x400.jpg 600w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-7.jpg 2000w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href=\"https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-4.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-4-300x200.jpg\" class=\"attachment-medium size-medium\" alt=\"Entregan la orden de proceder del telef\u00e9rico Panam\u00e1 - San Miguelito\" srcset=\"https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-4-300x200.jpg 300w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-4-1024x682.jpg 1024w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-4-768x512.jpg 768w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-4-1536x1024.jpg 1536w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-4-590x393.jpg 590w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-4-1005x670.jpg 1005w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-4-577x385.jpg 577w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-4-1200x800.jpg 1200w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-4-600x400.jpg 600w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-4.jpg 2000w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href=\"https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-2.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-2-300x200.jpg\" class=\"attachment-medium size-medium\" alt=\"Entregan la orden de proceder del telef\u00e9rico Panam\u00e1 - San Miguelito\" srcset=\"https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-2-300x200.jpg 300w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-2-1024x682.jpg 1024w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-2-768x512.jpg 768w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-2-1536x1024.jpg 1536w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-2-590x393.jpg 590w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-2-1005x670.jpg 1005w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-2-577x385.jpg 577w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-2-1200x800.jpg 1200w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-2-600x400.jpg 600w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-2.jpg 2000w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href=\"https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-300x200.jpg\" class=\"attachment-medium size-medium\" alt=\"Entregan la orden de proceder del telef\u00e9rico Panam\u00e1 - San Miguelito\" srcset=\"https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-300x200.jpg 300w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-1024x682.jpg 1024w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-768x512.jpg 768w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-1536x1024.jpg 1536w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-590x393.jpg 590w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-1005x670.jpg 1005w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-577x385.jpg 577w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-1200x800.jpg 1200w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-600x400.jpg 600w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito.jpg 2000w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href=\"https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-5.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-5-300x200.jpg\" class=\"attachment-medium size-medium\" alt=\"Entregan la orden de proceder del telef\u00e9rico Panam\u00e1 - San Miguelito\" srcset=\"https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-5-300x200.jpg 300w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-5-1024x682.jpg 1024w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-5-768x512.jpg 768w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-5-1536x1024.jpg 1536w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-5-590x393.jpg 590w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-5-1005x670.jpg 1005w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-5-577x385.jpg 577w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-5-1200x800.jpg 1200w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-5-600x400.jpg 600w, https:\/\/constructhubs.com\/wp-content\/uploads\/2026\/10\/Entregan-la-orden-de-proceder-del-teleferico-Panama-San-Miguelito-5.jpg 2000w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>Today, Thursday, October 15, 2026, the Government of Panama issued the notice to proceed to Doppelmayr Panam\u00e1 Corp., a subsidiary of the Austrian company Doppelmayr, a world leader in cable transportation systems, to build the Panama\u2013San Miguelito cable car. The project is a 6.6-kilometer, six-station cable transit system connected to the Panama Metro. The contract, [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":1596,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[508],"tags":[567,562,563,564,566,565],"class_list":["post-1584","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-cable-car","tag-doppelmayr-en","tag-megaprojects","tag-panama-metro","tag-san-miguelito-en","tag-urban-mobility"],"_links":{"self":[{"href":"https:\/\/constructhubs.com\/en\/wp-json\/wp\/v2\/posts\/1584","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/constructhubs.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/constructhubs.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/constructhubs.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/constructhubs.com\/en\/wp-json\/wp\/v2\/comments?post=1584"}],"version-history":[{"count":1,"href":"https:\/\/constructhubs.com\/en\/wp-json\/wp\/v2\/posts\/1584\/revisions"}],"predecessor-version":[{"id":1604,"href":"https:\/\/constructhubs.com\/en\/wp-json\/wp\/v2\/posts\/1584\/revisions\/1604"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/constructhubs.com\/en\/wp-json\/wp\/v2\/media\/1596"}],"wp:attachment":[{"href":"https:\/\/constructhubs.com\/en\/wp-json\/wp\/v2\/media?parent=1584"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/constructhubs.com\/en\/wp-json\/wp\/v2\/categories?post=1584"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/constructhubs.com\/en\/wp-json\/wp\/v2\/tags?post=1584"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}